At SPETCOM Construction and Investment, we take pride in executing a diverse range of projects that reflect our commitment to quality and professionalism at every stage of the work.
Ongoing Projects
Previous Projects
Jameela Dates Project – Jericho (Al-Ouja)
15 kW peak – 3-phase – On-grid – (07/2020)
Mr. Nabil Obeid Villa Project – Jericho (Ain Sultan)
15 kW peak – 3-phase – On-grid – (12/2020)
Mr. Mohammad Al-Atari Villa Project – Ramallah (Al-Baloua)
15 kW peak – 3-phase – On-grid – (12/2020)
Beit Ibrahim Hotel Project – Bethlehem (Beit Jala)
40 kW peak – 3-phase – On-grid – (12/2020)
Orthodox School Project – Jerusalem (Al-Eizariya)
10 kWh – 3-phase – Retrofit – 20 kWh lithium battery – (12/2020)
Nabco Factory Project – Nablus (Beit Iba)
1000 kWh – 11 kV – (03/2021)
Kharoub Carpentry Project – Jaljulia
72 kW peak – 300 kWh battery – 50 kVA generator – (09/2021)
Al-Am’ari School Project (UNRWA) – Ramallah (Al-Am’ari)
15 kW peak – 3-phase – On-grid – (01/2024)
Mr. Mohammad Adwan Villa Project – Ramallah (Jibiya)
5 kW peak – 14.4 kWh battery – Single-phase – (05/2024)
Industrial Elevator Rehabilitation Project (Amazon Engineering) – Ramallah (Beitunia)
1 ton – Single-phase – Classic panel – (08/2022)
Mr. Ali Sarmah Villa Project – Ramallah (Deir Dibwan)
50 Amps – 3-phase – 110 Volts – (10/2022)
Carpentry Workshop Rehabilitation Project (Amazon Engineering) – Ramallah (Beitunia)
40 Amps – 3-phase – (11/2022)
Mr. Tareq Sarmah Villa Project – Ramallah (Deir Dibwan)
40 Amps – 3-phase – 110 Volts – (01/2023)
Water Pump Installation Project, Jerusalem District – Ramallah (Ain Samiya)
(05/2023)
Villa No. 1, Mr. Tawfiq Nassar – Jericho (Al-Bansian)
40 Amps – 3-phase – (09/2023)
Villa No. 2, Mr. Tawfiq Nassar – Jericho (Al-Bansian)
40 Amps – 3-phase – (09/2023)
Mr. Osama Al-Hamad Villa Project – Ramallah (Birzeit)
150 Amps – 3-phase – (12/2023)
Al-Am’ari School Project (UNRWA) – Ramallah (Al-Am’ari)
100 Amps – 3-phase – (01/2024)
Reef Birzeit Residential Housing, Birzeit – Ramallah (Birzeit)
200 Amps – 3-phase – (03/2024)
Barakat Carpet Exhibition Construction (Abu Khadr Building) – Ramallah (Birzeit)
40 Amps – 3-phase – (10/2024)
Apartment Renovation Project, Mr. Bundali Ya’qoub Hasri – Ramallah (At-Tira)
25 Amps – Single-phase – (01/2025)
Al-Am’ari School Project (UNRWA) – Ramallah (Al-Am’ari)
100Amps – 3-phase – (11/2023 – 11/2024)